- 60,000 m² fair-faced concrete
- 110 km of joints
- 2024 Completion
On a major rail infrastructure project, our penetrating concrete sealer was put to work. Roughly 60,000 m² of white class-4 fair-faced concrete, along with nearly 110 km of joints, were protected with our system, for a flawless appearance and long-term durability of the surfaces.
The work was carried out together with a specialist for fair-faced concrete finishing. The project was completed on schedule in autumn 2024.